The Study of The Usage of Vacuum Preloading Method in The Construction Project Of Palembang – Indralaya Toll Road

Laili Ervianty, Hary Christady Hardiyatmo, Suryo Hapsoro
Submission Date: 2019-08-04 10:15:44
Accepted Date: 2019-11-18 00:00:00

Abstract


Palembang – Indralaya (Palindra) Toll Road is part of the Trans Sumatera Toll Road built on soft soil. Soil improvement using vacuum preloading method has been conducted to resolve the problem. The method involves replacing a surcharge load with an atmospheric pressure and utilizing vertical and horizontal drains, as well as sand blanket. Factors that influence the effectivity of the performance of the vacuum method comprise the settlement, the time of settlement, the speed of settlement, the degree of consolidation, the distance of the Prefabricated Vertical Drain or PVD, and so forth. The result of the settlement using Terzaghi’s equation combined with Indraratna’s showed that the addition of the height of the fill would have been effective if it had been equal or larger than the vacuum pressure that was used (80 kPa). It could be observed from attaining faster consolidation time of 56 days. The analysis result was, then compared with the final settlement by using Asaoka method. The design of the PVD distance by using vacuum method showed that the spacing (S) was less restrained, which was 1,23 m, compared to the one using with extra load (surcharge) which was 1,2 m. The settlement of vacuum consolidation was 1,98 m, which was smaller than the surcharge one that reached 2,11 m.

Keywords


Vacuum Preloading; Consolidation; PVD; Terzaghi; Indraratna; Asaoka

Full Text: PDF

CC Licencing


Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).

Refbacks

  • There are currently no refbacks.


Creative Commons License
Jurnal Teknik ITS by Direktorat Riset dan Pengabdian Masyarakat (DRPM) ITS is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at https://ejurnal.its.ac.id/index.php/teknik.
Statistik Pengunjung